Service Engineer

JOB RESPONSIBILITIES

  • Familiar with Industrial Protocol such as Modbus RTU, Modbus TCP/IP, Bacnet and SNMP.
  • Design & create input / output list of equipment.
  • Develop EMS system architecture, wiring diagram and panel layout for working and as built.
  • To design and create 3D Graphic User Interface to be used for the EMS workstation
  • To design and develop programming using ladder logic control for EMS.
  • To program the static and dynamic values of data for visual information display.
  • To design and fabricate EMS Panel including testing before deliver to site.
  • Project management & supervision of EMS project and coordinate with contractor to ensure all installation works done conform to drawing and solution requirement.
  • Conduct EMS testing and commissioning, this includes: conducting cable continuity test with cabling contractor to ensure correct cable specification and integrity, and verifying that all data feed is terminated correctly and accounted for.
  • Conduct assessment and ensure that the system operate its intended function based on the design parameters including communication setup and architecture, signal verification from field devices and equipment, controller operation parameters and filling the test report for submission.
  • To type, create and compile the Operation and Maintenance Manual for submission which is will be used as a reference by the end-user to operate the system.
  • Carry out preventive maintenance activities carried to identify problems on an ongoing basis before they result in equipment / device failure.
  • Troubleshoot find any fault of any irregularities on the system field devices, controllers and system functionality and advise any action or replacement parts required to resolve the issues.
  • Maintains documentation for all malfunction, repairs, maintenance or changes to systems or equipment.
    Records maintenance data and generates reports as needed.
    Monitors and verifies operation of all EMS field devices and equipment.

EDUCATION

  • Bachelor’s in Mechatronics Engineering (Hons)

REQUIREMENT

  • Required skills: CAD Software, 3D modelling software, PLC Programming Software, and Microsoft Word & Excel (Computer literate)
  • Proficient in writing in English
  • Multi-tasks effectively with good attitude
  • Trustworthy and able to maintain confidentiality with high level of commitment and initiative
  • Able to work independently

SUBMISSION

cy.wong@greenbayces.com (for positions based in Penang)

Electrical and Mechanical Drafter

JOB RESPONSIBILITIES

  • Draughting of electrical building & data centre services (Single line diagram, lighting & small power layout, ELV, Uninterruptible Power Supply (UPS), Genset, Transformer, MV & LV Power distribution system, Renewable Energy etc.) using AutoCAD or other engineering software(s).
  • Draughting of Mechanical building & data centre services (Air-Conditioning and Mechanical Ventilation System, Chiller System, Mechanical Schematic Diagram, Fire Protection, EWFD/VEWFD etc.) using AutoCAD software or other engineering software(s).
  • Draughting of Architectural layout for building and data centre (Key Plan, Building Architectural Drawings, C&S Drawing, Equipment layout plan drawing and etc.) using AutoCAD software or other engineering software(s).
  • To coordinate with client/consultants/suppliers/vendors/contractors for drafting works & M&E services coordination on drawing works.
  • Perform basic engineering design, calculation and tabulation.
  • To assist sales & solution teams on tender & contract documents preparation for submission.
  • To establish drawing standard and ensure high quality of drafting works and high drafting work efficiency/effectiveness.
  • To lead & develop the drafting standard template, library, list of drawings, title block, general notes, legends, symbols, models & etc. for AutoCAD drawing and other engineering drafting software (such as Revit BIM).
  • To conduct regular training for (junior) drafters & engineers for drafting skill and/or drafting work efficiency/effectiveness improvement purpose.
    Report to the head of solution department.

SUPERVISION

  • Receives daily supervision and workload from the Head of Department, Admin Department
  • Receives general supervision from the Director, Admin & Finance

EDUCATION

  • Higher Secondary/ STPM / ”A” Level / Pre-U, Professional Certificate or Diploma in Electrical Engineering / Mechanical Engineering / CAD or equivalent

REQUIREMENT

  • Min. 5 years working experience in data centre design and/or M&E design/ or other engineering software(s).
  • Proficient in writing in English
  • Multi-tasks effectively with good attitude
  • Trustworthy and able to maintain confidentiality with high level of commitment and initiative
  • Some knowledge in ISO documentation is necessary
  • Able to work independently
  • Computer literate

SUBMISSION

siti@greenbayces.com (for positions based in Shah Alam)

Contracts Engineer / Quantity Surveyor

JOB RESPONSIBILITIES

  • To prepare bill of quantity and costing for tender and/or enquiry submission
  • Providing the commercial/costing strategy for enquiry and tender
  • To review & evaluate contractor/supplier proposed material/product specification
  • Commercial negotiation with contractors & suppliers during tender stage or procurement stage
  • To prepare & compile contracts / tender document for submission
  • Procurement Planning – contractors & suppliers pricing analysis/comparison
  • Assisting Project Team & Sales Team on Project VO pricing analysis/comparison from contractors & suppliers and negotiation with contractors & suppliers
  • Develop material/equipment supplier/contractor database
  • Develop material/equipment/labour pricelist database
  • Reporting to Head of Solution Department

SUPERVISION

  • Receives daily supervision and workload from the Head of Department, Admin Department
  • Receives general supervision from the Director, Admin & Finance

EDUCATION

  • Bachelor in Engineering (Hons) Electrical or Mechanical

REQUIREMENT

  • Min. 3 years working experience in data centre design and/or M&E design/consultancy
  • Proficient in writing in English
  • Multi-tasks effectively with good attitude
  • Trustworthy and able to maintain confidentiality with high level of commitment and initiative
  • Some knowledge in ISO documentation is necessary
  • Able to work independently
  • Computer literate

SUBMISSION

siti@greenbayces.com (for positions based in Shah Alam)

Key energy saving technologies in data centers – in real life! (Part 2)

The Uptime Institute’s Global Data Center Survey 2022 suggests that over the next five years, data centers should play a role in energy conservation and carbon reduction, rather than being a hindrance to it.

With this in mind, Huawei plans to change the way people used to plan, build and operate data centers during the construction. Huawei’s Dongguan Cloud Data Center T1 project makes noticeable progress in energy conservation and carbon reduction. Put into operation in 2019, the project’s PUE reached 1.28 in 2021.

In Part 1 of this article, we have seen how digital technology enablement contributed to the success of the T1 project. Today, we look at other advanced energy-savings technologies which were employed.

AI-based PUE optimization
The T1 project employs an AI-based iCooling solution to decrease the energy consumption of the cooling system, which typically uses over 30% of a data center’s energy. This solution constantly monitors the energy consumption of all cooling subsystems and delivers the most efficient cooling strategy based on factors like current IT load and outdoor temperature.

Green construction and material recycling
The construction of traditional data centers often results in a high amount of waste and excessive water and power consumption. To address these issues, the T1 project employs a prefabricated modular solution where core components and systems are manufactured and pre-tested in a factory before being delivered and assembled on-site like LEGOs. This approach significantly reduces water usage and construction waste by 80%, reduces carbon emissions by 90%, and recycles up to 85% of materials, promoting eco-friendly construction and maximizing resource recovery.

Efficient and energy-saving devices
As data centers consume a large amount of energy, the use of energy-efficient and energy-saving devices is crucial to reducing energy consumption. The Huawei FusionPower6000 is utilized for power supply and distribution, providing a single source of power for each row, which boosts end-to-end efficiency to 95.5%. The cooling system is equipped with high-performance fans and wet film humidifiers to enhance energy efficiency. Additionally, smart modules are arranged in the equipment room to divide cold and hot aisles, optimizing heat exchange efficiency.

By using energy-saving technology, data centers can reduce their impact on the environment, contribute to a more sustainable future, and demonstrate their commitment to environmental responsibility.

Source: Huawei Digital Power

Key energy saving technologies in data centers – in real life! (Part 1)

Huawei’s Dongguan Cloud Data Center T1 project (T1 project for short) is among the two green data centers in China to have been selected as a typical application case of key energy-saving technologies 2021 by the National Energy Conservation Center for the large amounts of energy it has saved during operation. Put into operation in 2019, the project’s PUE reached 1.28 in 2021.

Today, we look at how digital technology enablement contributed to the success of the T1 project.

Due to insufficient simulation of air ducts and airflows at the design phase and backward onsite assembly and construction, traditional data centers have a higher PUE than the designed one. By contrast, the T1 project uses digital design, simulation, and manufacturing, reaching a designed PUE in actual operation.

Digital design
Thanks to the building information model (BIM) and the 3D digital twin technology, the pipeline collision experiments can be carried out automatically and pipeline interference can be identified in advance, improving design quality and reducing changes by 80%.
Digital simulation
Big data, cloud, AI algorithms are used to analyze multi-device working condition curves and full climate databases. On top of that, we use expertise to develop a 3D linkage simulation algorithm involving pressure, temperature field, and airflow, which improves the PUE design accuracy by 20%.
Digital manufacturing
Videos are issued through software to guide production, which ensures consistency between design and production. Besides, digital testing methods are used to keep the air leakage rate of air ducts under 1%, outperforming the industry average of 3%.

Next week, we will look at other advanced energy-savings technology which was employed in the T1 project.

Source: Huawei Digital Power

Is zero-carbon data centers possible?

Data centers consume a great deal of energy and resources, and they are one place that many organizations seek to cut back – with the goal of eventually reaching net-zero carbon emissions. Globally, leading data center operators have committed to carbon neutrality and science-based targets for emissions reduction by 2030. The challenge is how to achieve this. Huawei has outlined four core trends for the future direction of data centers.

Sustainable:
Next-generation data center facilities will be fully green and energy-efficient while maximizing the recycling of all data center materials. In this way, the overall data center ecosystem will be eco-friendly and environmentally sustainable. Sustainable data centers can be achieved by utilizing green resources – electricity, land, and water – and maximizing the recycling of used materials throughout the life cycle. In addition to the extensively used Power Usage Effectiveness (PUE), other metrics, including Carbon Usage Effectiveness (CUE), Water Usage Effectiveness (WUE), and Grid Usage Effectiveness (GUE) will also be used to measure data center sustainability.
Simplified:
Simplified architecture, power supply, and cooling embody the evolution of the data center facility. Simplified architecture brings innovative forms of buildings and equipment rooms. If the prefabricated modular construction mode is used to construct a 1000-rack data center, the construction period can be reduced from more than 18 months to 6–9 months. Simplified power supply reshapes components and links. It shortens the delivery period from 2 months to 2 weeks. Simplified cooling maximizes heat exchange efficiency by changing multiple heat exchanges to one heat exchange, and shortening the cooling link.
Autonomous Driving:
O&M automation, energy efficiency optimization, and operation autonomy reshape the management of data centers’ operation and maintenance. O&M automation enables engineers to complete the inspection of 2000 racks in 5 minutes remotely. The energy efficiency optimization means an optimal cooling strategy can be delivered via 1.4 million original combinations within 1 minute, achieving smart cooling. Operation autonomy maximizes the value of resources.
Reliable:
Proactive security and secure architecture ensure high quality and sustainable development of data centers. Proactive security means using big data and AI technologies to implement predictive maintenance from components to data centers, based on the visibility and perception of all domains in the data centers. Automatic fault response means it will take only 1 minute to spot a fault, 3 minutes to analyze, and 5 minutes to recover. Secure architecture means security will be ensured at various levels, such as components, devices, and systems. At the system level, the E2E visualizable, manageable, and controllable platform enables the system availability to reach 99.999%.

Solving the challenge of growing demand for data with low-carbon solutions, Huawei’s next-gen simplified, green, intelligent, and secure data center infrastructure solution is only one of the solutions. Reducing carbon emissions is essential for the industry and an area in which innovation focuses on converging software and hardware as well as cross-product-domain collaboration. With so many technical innovations, expertise and best practice at our disposal, the journey to zero-carbon data center is now achievable.

Admin Executive

JOB RESPONSIBILITIES

  • Answering phones and responding to client requests and inquiries.
  • Managing and updating company databases.
  • Keeping track of inventory and ordering supplies.
  • Maintaining financial and client records.
  • Organizing events, scheduling meetings, and making travel arrangements.
  • Managing the maintenance of office and facility equipment.
  • Providing administrative support to other departments or projects as needed.
  • Performing other duties as assigned.
  • Work with Sales and Solution Team to help plan, develop and execute the finalization of proposal or tender.
  • Provide pre-sales support on customer opportunities which could include customer meetings, understanding and documenting customer requirements, producing high-level design documentation including network diagrams and providing technical input on proposals and tender responses.
  • Will be involved in Servicing and Maintenance Team when required.
  • Prepare, schedule, coordinate, cooperate and communicate with contractor and Project Team.

REQUIREMENT

  • Diploma Business Administration or Business Management or Accounting and Finance Management.
  • More than 3 years of experience in management position
  • Good knowledge in measurement, pricing and preparation of bill of quantity
  • Good coordination, liaison, negotiation and communication skills
  • Able to work independently, possess own transport

SUBMISSION

siti@greenbayces.com (for positions based in Shah Alam)

Sales Executive & Sales Engineer (Penang)

JOB RESPONSIBILITIES

  • Responsible to promote and sell company’s products/services/solutions to existing and new customers to achieve personal sales target.
  • Maintain and develop good relationship with existing and new customers and business partners.
  • Provide product technology update presentation/sharing to customers and business partners.
  • To solicit and develop new sales lead, provide suggestion and offer the most appropriate solution to customers and business partners.
  • Follow up closely on sales inquiries and provide quotations to customers and business partners.
  • Aggressively visit the new and potential customers, consultants to seize the new project, specify company product specifications into the Building of Materials/Quantities.
  • To develop new market territories, plan for marketing event and work closely with product suppliers and principals.

REQUIREMENT

  • Minimum Diploma in Electrical or Mechanical Engineering / Facilities (factory) / M&E Consultant / IT Infrastructure / UPS / Data Center/ business development and marketing knowledge preferable. –
  • Bachelor Degree (Hons) Business Development and Marketing
  • More than 3 years’ experience in renewable energy products sales or related field.
  • Knowledge in Solar Inverter System, EV Charger, Energy Storage System will be value added.
  • Able to demonstrate and present company’s products /services /solutions effectively to customers and business partners.
  • Good knowledge in measurement, commercial pricing and preparation of bill of quantity.
  • Good coordination, liaison, negotiation and communication skills.
  • Self-discipline, Proactive and keen in organizing sales activities and customer visits.

SUBMISSION

Position is based in Penang. Kindly send in your application and your resume to:
cy.wong@greenbayces.com

Getting as much value as possible with after-sales maintenance

After-sales maintenance helps ensure that a customer gets as much use and value as possible out of their purchase. A great product should be backed up with excellent maintenance support as this provides a positive experience to customers.

The business reasoning behind after-sales support is that it can contribute to brand loyalty and positive word-of-mouth. An example of a brand which understands this reasoning is Huawei.

Huawei Hi-Care services provide a variety of maintenance services for customers. Huawei Hi-Care provides industry-leading Technical Support Centers (TAC), global service organizations, hourly spare parts supply capabilities, standard Issue to Resolution (ITR) processes, and advanced IT tools to respond to customer service requests in a timely and efficient manner.

Technical Assistance Center (TAC) Support
Huawei’s global technical support organization has three Global TACs, five Regional TACs, and five Country TACs that provide CS services for customers in over 130 countries 24 hours/seven days a week. With access to TAC expertise, you can expedite issue resolution and optimize network operation.
Advance Hardware Replacement Service
Advance Hardware Replacement Service entitles you to receive replacement hardware after your service request is accepted by Huawei. Huawei’s worldwide spare parts operation and logistics centers will guarantee that hardware will be delivered as agreed SLA in your contract.
Onsite hardware replacement
For the problems that cannot be resolved without replacing the hardware, Huawei will assign experienced technical support engineers to your site to replace the hardware and rectify the fault to restore your system.
Online Self-help Support
Access to Huawei Website Knowledge Base, software releases, product documents, materials, tools and notifications, as well as Smart Q & A, et., to improve the maintenance capability of your engineers.
Operating System Software Updates
System software correction patches and minor version releases are available from Huawei’s technical support website.
Alerts Call Home
Hardware alarm is automatically reported to Huawei technical support center by Call Home system, and then Huawei informs customer if necessary.

Huawei has always been committed to providing customers with more professional and intelligent maintenance services. Huawei Hi-Care services go beyond traditional phone or email support as customers can seek help from multiple channels such as the intelligent Q&A chatbot and the technical support community. In addition, customers can use the intelligent maintenance center ServiceCare to manage inventory and service requests, and quickly obtain product technical information and service reports.

At GreenBay, we believe that an effective maintenance strategy is concerned with maximising equipment uptime and facility performance while balancing the associated resources expended and ultimately the cost. When a brand offers maintenance services (such as Huawei Hi-Care) which can assist in getting sufficient return on your asset investment, it is an indication that your maintenance strategy is on the correct trajectory to be successful and fuss-free.

Reducing energy use by 8-15% with Huawei’s iCooling@AI solution

A data center’s power usage effectiveness or PUE, is seen as a key indicator for evaluating its energy efficiency. The PUE value rises as the data center becomes less efficient. Cooling, a key component of a data center, is one of the main factors which can address the issue of energy efficiency.

Cooling is closely related to equipment heat dissipation, equipment configuration, facility environment, and external climate conditions. After Operations and Management (O&M) reaches a certain maturity level, hardware energy saving or human experience-based simple optimization cannot further reduce power consumption.

Therefore, Huawei has leveraged on machine learning to develop its iCooling intelligent thermal management solution for data centers. The iCooling solution incorporates deep learning to analyse historical data and identify key factors which affect energy consumption and create a PUE prediction. An optimisation algorithm then establishes the ideal parameters which are transmitted to various control systems.

The key technologies used in the iCooling solution include:

  • Big data collection
    Given the complexity of data center cooling systems, information about the power supply system, cooling system, and environment parameters must be collected.
  • Data governance and feature engineering
    First, a mathematical tool is used to perform data governance on the raw data collected, providing high-quality data for subsequent model training. Second, feature engineering is performed on large amounts of raw data to identify the key parameters that affect PUE.

Creating a PUE model using a neural network:
Neural networks are a set of machine learning algorithms that can simulate the cognitive behavior of interactions between neurons. Deep neural networks can play a role in increasing the cooling efficiency of data centers. The machine learning algorithms of these networks can find the relationships between parameters of different pieces of equipment and systems. A mathematical model or the PUE model of the data center is created based on large amounts of data from sensors.

Inference and decision-making using genetic algorithms:
Based on the input PUE model and the operating data collected in real time, the algorithms find the best policy in four steps: parameter traversal and combination, service rule assurance, calculating the energy consumption of the cooling system, and selecting the optimal policy.

At Huawei’s cloud data center Langfang in China, the deployment of iCooling has resulted in a PUE that is eight percent lower than it previously was, which translates to major savings in annual power costs. At a China Mobile data center in Ningxia, the introduction of iCooling technology has reduced the data center’s total energy consumption by 3.2%, saving more than 400,000 kWh of electricity a year. According to Huawei, as data centre loads increase and AI learning capability improves, six million kWh of electricity will be saved in the data center every year, the equivalent to a reduction of about three million kilogrammes of carbon dioxide emissions.

With extensive experience and technical expertise in global data center construction, Huawei has proven that the power of AI and big data is the key to create greener data centers.

Source: Huawei